APPLICATIONS
Portfolio
HSBC BANK LEICESTER
The project required a system with the flexibility to support a multitude of air handling units and the associated services, including mounting pipework, ducting and cable trays. After detailed consultations with AC2000, the AC Contractor, Big Foot Systems were able to propose a bespoke support solution. The AHU frames were designed for the services to be positioned directly underneath, supported from the underside of the frame on cable trays...
Read more about this case study
HACKNEY PRIMARY CARE TRUST
Initially plinths & steel beams had been specified to support the roof plant, however, concerns were raised about the integrity of the roofing membrane. Using traditional fixed roof supports would have meant that any future repairs to roof surface could require the AC plant to be decommissioned. The potential risk of decommissioning services was seen as having an unacceptable impact on the Trust’s operations. The initial plinth design were therefore rejected in favor of a the more flexible Big Foot Systems...
HSBC BANK LEICESTER
The project required a system with the flexibility to support a multitude of air handling units and the associated services, including mounting pipework, ducting and cable trays.
HACKNEY PRIMARY CARE TRUST
The initial plinth design were therefore rejected in favor of a the more flexible Big Foot Systems.